Airfields

Mackay Airport, Queensland, Australia

A 2016 Pavement Condition Report on Mackay Airport’s runway 14/32 proposed resurfacing which was planned for 2020/21. The Mackay Airport team started the process of identifying a suitable surface preservation treatment to sustainability extend the life of the runway, last resurfaced in 2010.
 

Read full case study

Alderney Airport, Guernsey, UK

Alderney Airport is operated by the States of Guernsey. The runway was heavily oxidised and routine FOD sweeps were collecting on average over 400kg each month. The States of Guernsey sought a detailed solution for redeveloping Alderney’s runway. Treatment with RHiNOPHALT would provide a major improvement in the surface quality…

Read full case study

Brussels Airport, Belgium

Brussels Airport is an international airport located in Zaventem, 12km northeast to the capital of Belgium. The Southern Runway (07R/25L) was resurfaced in 2015 using grooved Marshall Asphalt and the airport wanted to preserve the surface course to extend the service life, utilising preventative maintenance as part of their life cycle planning.

Read full case study

RAF Brize Norton – Runway & Taxiway Works

Allied Infrastructure has a history of working at RAF Brize Norton having successfully carried out a full runway Rhinophalt® application of 167,000m2 in 2017.

Read full case study

Over the last few year's our asphalt preservation webinars have given several local authorities and other organisations a true insight into the benefits of Rhinophalt®, asphalt preservation in the UK and around the globe.

The webinars go into detail about why preservation is important and the benefits of using Rhinophalt®, they explain the simple and cost-effective application process and why it is important to use a trusted, original and authentic source of asphalt preservation.

Interested in a FREE webinar on the benefits of preservation?

ASI

Could preservation
work for you?
Book a free site visit