Airfields

Mackay Airport, Queensland, Australia
A 2016 Pavement Condition Report on Mackay Airport’s runway 14/32 proposed resurfacing which was planned for 2020/21. The Mackay Airport team started the process of identifying a suitable surface preservation treatment to sustainability extend the life of the runway, last resurfaced in 2010.

Alderney Airport, Guernsey, UK
Alderney Airport is operated by the States of Guernsey. The runway was heavily oxidised and routine FOD sweeps were collecting on average over 400kg each month. The States of Guernsey sought a detailed solution for redeveloping Alderney’s runway. Treatment with RHiNOPHALT would provide a major improvement in the surface quality…

Brussels Airport, Belgium
Brussels Airport is an international airport located in Zaventem, 12km northeast to the capital of Belgium. The Southern Runway (07R/25L) was resurfaced in 2015 using grooved Marshall Asphalt and the airport wanted to preserve the surface course to extend the service life, utilising preventative maintenance as part of their life cycle planning.

RAF Brize Norton – Runway & Taxiway Works
Allied Infrastructure has a history of working at RAF Brize Norton having successfully carried out a full runway Rhinophalt® application of 167,000m2 in 2017.